Why use Evercrete?
Since the plant is located inside a national park, environmentally-friendly material is a must for the renovation project. Also, low VOC material is the second criteria for the project. Therefore, Evercrete DPS was the only choice which could fulfill all the requirements.
In the project, Evercrete DC250 was used to clean up the dirt / grease inside the concrete of the cooling tower. After a thorough and deep cleaning, Evercrete DPS was used to preserve the concrete before the surface re-modeling. Through the treatment, Evercrete helped to increase the alkalinity of the concrete and which will preserve the concrete as well as reinforce its ability to stand the test of time in extreme conditions.